Below is introduction of installation process of curtain wall rock wool board
5. The arrangement of anchor points: Anchor points are set at the four corners of the rock wool board and the middle of the horizontal joints. The anchors are installed with a vertical distance of 300mm and a horizontal distance of 400mm. They are arranged in a quincunx pattern. At the corners of the base wall anchor distance should be narrowed to 200mm, and at the same time they should meet the requirements of its design and related standards.
6. Rain and moisture protection measures: When the rock wool board on the top of wall is finished before hanging the stone and applying glue, we need to cover it with a plastic sheet to prevent rain from leaking inside the rock wool board.
For single anchor check, the standard value of tensile strength should be greater than or equal to 0.3kN.
During the construction, all professional types of work should be closely coordinated, and the procedures should be arranged reasonably, and it is strictly forbidden to reverse the procedures.
The rock wool board should be prevented from hitting by heavy objects, and should be repaired immediately if found.
Above is the introduction of installation process of
curtain wall rock wool board. Hope this can bring you some help.